Water supply & mains
- High-pressure water mains
- Booster pump sets and pressure control
- Bulk storage tanks and back-up water
- Meter installation and sub-metering
Backflow & compliance
- Backflow prevention devices to SANS requirements
- Annual testing and certification
- Cross-connection surveys
- Plumbing COCs on compliance work
Hot water & heat
- Industrial hot-water systems
- Heat pumps and geyser banks
- Boiler feed and circulation lines
- SANS 10254 compliant installations
Grease & waste
- Grease trap supply, installation and servicing
- Fat, oil and solid waste removal
- Canteen and staff ablution drainage
- Scheduled jetting programmes
Drainage & sewer
- High-pressure drain jetting
- CCTV-assisted blockage tracing
- Sewer line repair and re-routing
- Stormwater and yard drainage
Water efficiency
- Leak detection and water-loss audits
- Rainwater harvesting
- Greywater re-use systems
- Consumption reporting for ESG
Built around production, not around us
Industrial downtime is expensive. We plan shutdown work around your production calendar, work night shifts and weekends where needed, and keep the site safe and documented throughout.
What you get on every visit
- Site induction compliance and PPE
- Method statement for planned shutdown work
- Photo record of before, during and after
- Itemised invoice mapped to the approved scope
What we need from you
- Site access arrangements and induction requirements
- Preferred shutdown or low-production windows
- Existing plumbing drawings, if available
- A single site contact for sign-off